This project is located in the kitchen waste treatment plant in Cixi City. The source of sewage is the methane liquid produced after the medium temperature anaerobic digestion of kitchen waste in addition to impurity and oil extraction, and also includes a small amount of domestic sewage and other production sewage. The first phase of 200t/d regulating tank and 100t/d biochemical treatment system have been built. This project includes the first phase of sewage treatment renovation system and the second phase of the new MBR sewage treatment system, the size of 100t / d, and ultimately reach a sewage treatment scale of 200t / d. The project is expected to be completed by the end of this year.
Ningbo Kaicheng Ecological Kitchen Methane Treatment Project
Project Address
Cixi, Zhejiang
Module Model
CFP-A4-PTFE
Water treatment capacity
200t/d
System water source
kitchen waste liquid
Fluxes
11~13L/m²·h